Customization: | Available |
---|---|
After-sales Service: | 1 Year |
Warranty: | 1 Year, 1 Years |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1.5kw 380v 2.5MPa Electric Pressure Testing Pump
4DSY electric pressure test pump, (hereinafter referred to as pump) is for all kinds of pressure vessels, pipes, valves, boilers, cylinders, pressure vessels, steam boiler, fire equipment as the laboratory for hydraulic test and obtain high pressure liquid in the laboratory.Pressure test products and supporting pressure test and test engineering.
The pump system is specially designed according to the hydraulic test requirements.In the initial stage of pressure test (four missing work) can quickly fill liquid and boost pressure, to shorten the test time.Has a large flow rate.When the pressure exceeds 1.6Mpa (this pressure can be lowered), the pressure test can be smooth and slowly.The flow rate automatically decreases, so the pump has two kinds of flow in high and low and can automatically transform.Hydrostatic tests may be performed below the rated discharge pressure.
Working principle: the cam is rotated by an electric motor.When the cam pushes the plunger upward, the sealing volume formed by the plunger and the cylinder block decreases, and the oil is extruded from the sealing volume and discharged through the check valve where needed.When the cam rotates to the descending part of the curve, the spring forces the plunger down to form a certain degree of vacuum.The cam makes the plunger rise and fall, the sealing volume periodically decreases and increases, and the chemical plant boiler test pump pressure vessel is constantly converted into liquid pressure energy
This pressure test pump is suitable for water as medium or hydraulic oil as medium, various pressure vessels, pipelines, valves, boilers and other pressure tests, suitable for chemical, construction, water heating oil, coal, smelting, ships and other industries, can be hydraulic source to provide the required pressure.
When the start of use, or stop using the pump for a long time, the first start of the switch on the collector block exhaust, until the exhaust valve is tight, can be put into normal operation.
Name | Electric pressure test pump |
Application | hydrostatic test |
Driving mode | electric |
Working pressure | 2.5mpa |
High pressure flow | 340L /h |
Mortgage flow | 760L /h |
Voltage | 380 v |
Power | 1.5 kw |
Weight | 120 kg |
External dimension | 84*47*90mm |
1. 24 hours on line service, support Chinese, English, Spanish, French, German, Russian ,technical guidance.
2. When meets machine failure problem, our factory will ensure that the problem is solved within 1 hour.
3. Povide machine install video.
4. Provide logistics information, like shipping by sea, shipping by express DHL, FEDEX delivery, real-time tracking service.
5. If machine is broken ,Non-human causes,the new machine will be provided or new parts will be provided.
Are you manufacture?
Yes. We are one of leading manufacturers
Do youhave Stockproductions to sell?
Yes,ofcourse.Butwe also offer OEM service. Please send us some drawing.
What information do you want to know if i want to get a quotation?
a). The model/size of your products.
b). The application for your products.
c). Special package methods if you needs.
d). Raw material.
Do you inspect the finished products?
Yes.Each step of products will be carried out inspection by QC department until shipping
What advantages do you have?
(1) Punctual: Have your orders met with the latest delivery?
We are a manufacturer with so many advanced and new machines. It ensures we have the ability to carry out the production schedual for punctual delivery.
(2) 20year production experience. We have over 20 years exprerience in this industry.
That means we can preview the problems for the orders and production. Therefore, it will make sure to deduce the risk of bad situation to happen.
(3) Point to point service.
There is two sales departments who will serve you from inquiry to products shipped out. During the process, you just need to discuss with him for all the problems and the way sames much times